Banyu Urip Project

CLIENT : PT Rekayasa Industri
LOCATION : Indonesia
DURATION : 38 Months
COMPLETION DATE : January 2015

This project provides the facilities for the production, sweetening and transportation by pipeline, storage and offtake of 185kbpd (165kbpd annual average) of sour crude oil and associated gas. The pipeline is 20-inch diameter; heat insulated and ends with a 23km long subsea section that terminates at the offshore floating storage and offloading (FSO) vessel which is tethered to a Mooring Tower Structure positioned at 33m water depth.

Iraq Crude Oil Export Project

CLIENT : Iraq South Oil Company
LOCATION : Iraq
DURATION : 24 Months
COMPLETION DATE : September 2012

1.8 MMBOPD being exported from the KAAOT and ABOT Offshore Terminals via two 48-inch, one 42-inch and two 32-inch pipelines. The current export facilities were built in the 60’s and 70’s and designed for a 20 year life expectancy with proper maintenance.
OFNIR ENGINEERING provided engineering services for the first phase of the project that includes design, procurement and installation of two 48-inch pipelines, a third pipeline shore approach section, a spur pipeline and three SPM’s.

Brunei Methanol Export Facility Project

CLIENT : Brunei Economic Development Board (BEDB)
LOCATION : Brunei
DURATION : 11 Months
COMPLETION DATE : April 2010

This project provides the facilities for the production, sweetening and transportation by pipeline, storage and offtake of 185kbpd (165kbpd annual average) of sour crude oil and associated gas. The pipeline is 20-inch diameter; heat insulated and ends with a 23km long subsea section that terminates at the offshore floating storage and offloading (FSO) vessel which is tethered to a Mooring Tower Structure positioned at 33m water depth.

Floating Liquefied Natural Gas Project

CLIENT : Krohne Oil & Gas
LOCATION : Malaysia
DURATION : 6 Months
COMPLETION DATE : Ongoing

Ofnir performed specialist engineering design and analysis services for the manufacture and installation of 3 bespoke skids. Caesar II and STAAD.Pro software packages were utilised to ensure a comprehensive analysis for a safe, efficient and cost effective solution.

Other Selected Projects

PROJECT CLIENT LOCATION COMPLETED SCOPE OF WORK
Tanzania Port SPM and Pipeline Replacement Project Tanzania Port Authority Tanzania November 2011

15 months

Engineering Management, Pipeline Detail Design, Final Design Report
Zuhal East Development Project Dialog Malaysia Malaysia May 2014

9 months

Engineering Management, Pipeline Detail Design, Final Design Report
Bukit Tua Project PT Timas Suplindo Indonesia May 2014

12 months

Engineering Management, Pipeline Detail Design
XA Process Platform X-Ray Field to Pusat Pengumpol Produksi Balongan Project PT Timas Suplindo Indonesia July 2014

12 months

Engineering Management

Onshore/Offshore Pipeline Detail Design

Procurement Support

Subsea Pipeline and Onshore Receiving Facility Project PT Rekayasa Engineering Indonesia June 2011

5 months

Engineering Management, Pipeline Detail Design, Final Design Report
Mangala SPM Project Cairn Energy India May 2010

3 months

Engineering Management, Pipeline Detail Design, Final Design Report
Visakh Refinery SPM Project Hindustan Petroleum Corporation India September 2009

3 months

Engineering Management, Pipeline Detail Design, Final Design Report